Skip to content

Project update · 3 min read

EYWA Dubai update: construction, five available residences and current terms — August 2026

EYWA Dubai construction update, August 2026: Tree of Life and Way of Water status, five named available residences, exact list prices and handover context.

Published
EYWA FACADE — EYWA Tree of Life
EYWA FACADE

This is a dated record, not a claim that availability is live to the minute. The underlying partner sheet was captured on 29 August 2026 and this update was published the next day. It names five residences, their exact list prices and the stated construction position of both EYWA towers. A residence can be reserved after publication, so the sales desk still reconfirms the unit and price in writing.

Construction position by tower

Tree of LifeWay of Water
Stage stated in August 2026Passed 60% completion in July; fit-out and MEP works ongoingPiling works due to begin in September 2026
Handover stated in the partner briefQ1 2027Q1 2029
Payment contextDeveloper-confirmed schedule: 60 / 40Current schedule confirmed in writing by a manager for the selected residence
Residences in the project5265

The contrast matters more than a single headline price. Tree of Life is the nearer-handover route and is already in fit-out and building-services work. Way of Water is the earlier construction-stage route. Its later handover and current lower entry point are part of the same trade-off, not two unrelated facts.

The 60/40 Tree of Life schedule comes from the developer presentation. The Way of Water architectural presentation does not contain a current public payment schedule, so a manager checks the sales documents for the selected residence and sends the applicable schedule in writing. For either tower, the schedule attached to the signed reservation and sale documents controls.

Five named residences in the 29 August release

TowerUnitFloorBedroomsTotal areaList price
Tree of Life702723,580 sq ftAED 22,926,141
Tree of Life11011135,189 sq ftAED 30,898,160
Way of Water12011234,954 sq ftAED 27,566,488
Way of Water12031222,958 sq ftAED 16,773,846
Way of Water12041222,184 sq ftAED 11,006,251

This is a named selection, not a count of every unsold residence in the project. It also resolves an important distinction in the pricing data. The full Tree of Life catalogue starts at AED 12.49 million by type, while the lowest residence in this specific cross-tower release is Way of Water unit 1204 at AED 11,006,251. Those figures describe different datasets and should not be blended into one undated “from” price.

The live prices and availability page carries the current table and now preserves each dated commercial release below it. Future releases can be appended without rewriting this August record, making changes in named inventory and list prices visible over time.

How to request current purchase terms

Private purchase terms are residence- and date-specific, so this public update does not publish them as a standing promise. Use the private terms request with the residence type or unit number. A manager will verify the official price, availability, applicable schedule, validity date and current private terms against the sales documents and send them in writing.

The signed reservation form, payment instructions and SPA take precedence over this dated summary.

Which tower is the practical alternative?

Tree of Life is the clearer fit when the priority is nearer handover, a project beyond the 60% construction milestone and a complete catalogue price list. Way of Water is the clearer fit when the priority is an earlier-stage entry, a lower price among the five currently named residences, or a duplex and larger upper-level formats.

That choice is developed in the factual Tree of Life versus Way of Water comparison, including scale, unit mix, amenities, timing and the difference between a published developer schedule and a residence-specific schedule confirmed by a manager.

What to request before deciding

Ask for the current availability sheet, the exact floor plan for the unit number, its internal and terrace areas, the residence-specific payment schedule, the reservation form and written confirmation of any private purchase terms. Those documents answer the questions a dated public update cannot: whether the residence is still open now and which terms apply today.

Developer claims are attributed as such. Figures come from the R·Evolution sales presentations for Tree of Life and Way of Water unless another source is named.

Sources used

Source: EYWA developer price and availability release — 29 August 2026 ; EYWA Tree of Life — developer presentation (73 pp.) ; EYWA Way of Water — developer presentation (109 pp.)

Data updated: 2026-08-29

Related articles

All articles

Enquiry

Official developer list prices are already public. After you submit, a manager checks current availability, the private terms for your shortlist, their validity date and the applicable payment documents.

Want the underlying documents?

Ask for the price list, floor plans and payment schedule and we reply in writing, with the source for every figure quoted.